Audi A3 SUV Elektrisch China  Instrumententafel

on behalf of a 1st supplier for interior components

130 production sites

33.000 Employee woldwide

7,5 Mrd. EUR Turnover /anno

Task:

Resident Engineer

Audi A3 2020 similar A3 SUVe  CN   -    Pic from Autobild.de

 

 

DAIMLER C-Class W206 - center console and instrument panel

on behalf of a 1st supplier

Task:

AME  Advanced Manufacturing Engineer
Product and process development PEP

 

            

 

   

DAIMLER S-Class and Maybach BR223 - X222               Seat development

on behalf of a 1st supplier

Task:

Program Management
Development of the overall seat 1st and 2nd series    Program Management
Headrest Development 1st and 2nd Series    Program Management
Development Seat covers Technical project management Development

 


Front seat
 

BMW F 42 - BMW 1 Series - Floor Console

on behalf of a 1st supplier

Task:

Project Manager Product and Process Development PEP

Interior circumference laminated leather
Product and process development
Design and procurement of the production equipment
Construction, start-up and launch management of the entire production line up to the SOP

 

 

Porsche models PO992 911er - instrument panel

on behalf of a 1st supplier

Task:

Development Engineer Interior PEP

Development instrument panel PEP
Chute channel development and validation
Chute channel shot test evaluations and documentation, etc ..

 

 

 

 

 

Mini Countryman F60 - Slush instrument panel

on behalf of a 1st supplier

Task:

LEAD ENGINEER

Takeover of product process development Slush - instrument panel PEP
Launch Management
with distinction Automobil-Produktion.de
we receive the award for external support as LEAD ENGINEER:

Automotive Innovation Awards 2017 of Society of Plastics Engineers (SPE)

Link zu Automobil Produktion.de

Mini F60 R60

 

Ford Lincoln CD 503 leather instrument panel

on behalf of a 1st supplier

Task:

Technical product manager 

Product and process development PEP
Hard-wrapped leather instrument panel

 

  Bildergebnis für lincoln continental 2017

 

Ford Explorer MKZ Leather I-panel

on behalf of a 1st supplier

Task:

Technical Product manager

Product and process development PEP
Hard-wrapped leather instrument panel

 

Audi Q7 4M      Leather dashboard

on behalf of a 1st supplier

Task:

Technical product manager
Product and process development PEP

Product and process development PEP
Leather instrument panel in all component variants

 Bildergebnis für audi q7

 

Audi TT FV    Instrument panel interior

on behalf of a 1st supplier

Task:

Component Responsibility

Development PEP
Slush I-panel

 

 

Audi A4, BMW E65 7er Headliner

on behalf of a 1st supplier

Task:

Project Manager Product Process Development

Head of the overall project
Management of production planning and control (PPS) (loading / assembly / capacity planning and control)
Ensuring and monitoring scheduling and milestones
Coordination of interfaces / bottlenecks in close coordination with the areas Operations, Program, SCM, Repair
Responsibility about costs and quality
Product and process development PEP



 Bildergebnis für bmw 7er e65

Headliner production

 
                               E65 Headliner                                               sun visor                          Headliner Module with sunroof frames  

Daimler W212 E-Klasse   Miko

on behalf of a 1st supplier

Task:

 

Component Responsibility

Development and integration of the Miko W212 PEP


 

 

 

Project management and development

Customer: Company Dräxlmaier

 

 

 

Infrared welding machines - vibration welding machines and heating plate welding machines

Assignment:

Program Manager
Contract project manager


all types of welding equipment

Fa. Bielomatik

 
 
 



Camera-based thermal image monitoring

 

Pics from Fa. Bielomatik
 

 

Overall Project Manager Plant and Conveyor Technology

Production lines BMW Munich, Dingolfing, Regensburg
Remolus project production line 5er E39
Conveyor line 7er E65 new paint shop Munich ....         


Project Planning:

layout planning
feasibility studies
Cycle time calculations
Run-time analysis
Capacity and resource planning
cost planning
scheduling

Development of the components

Production Planning and Control
Delivery to the customer
Assembly and commissioning up to final acceptance

components:

Special machines and systems engineering
Hot and cold lifter
Belt-track roller conveyors and overhead conveyors
Scissor
Rotating conveyor tables
eccentric lifting
cross conveyor
Skid conveyor plants
Intermediate buffer storage
Control and electrics
Integration of applications such as robotics e.g. ABB, Fanuc
etc.

 
   

   

 

 

                                                                                                                                         

altogether approx. 60 projects within the PEP of precision moldings


 


SENIOR PROJECT MANAGEMENT

Project leader Molding processes
Project Manager Development Vehicle Construction
Component responsible for vehicle construction                                     Process optimizer
Constructor  injection molding tools

Industrial engineering
Manufacturing Engineering
Launch Management

contents:

Product Development, PEP
feasibility study
Quality planning and acceptance
Process development - and optimization
Change Management
Value stream mapping, value stream maps
Supply chain and transport concepts
Material flow optimized and supported layout design ..... production and factory layout ...
Lean management

 


      

Audi A4 Pillar Covering                            Mini F60 Glove box                                Mini F56 Air Outlet

-

PO987 Cupholder

Development of complex injection molding processes up to series approval

Pic from KraussMaffei

 

Cube molds

In Mould assembly


Form + Werkzeug